SaskPower Smart Meter Exchanges Underway in Battleford
SaskPower work crews and authorized contractors are currently in the area replacing existing power meters with new smart meters across Battleford.
What Residents Need to Know
Brief Power Outage: During the exchange, installers will turn off electricity temporarily (typically lasting 15 to 20 minutes) to swap the meter safely.
On-Site Notification: Technicians will knock on your door prior to starting the installation.
If no one is home, work will proceed, and a door hanger notification will be left when the job is complete. Property Access: Please ensure that work crews have clear and safe access to your power meter box (e.g., gates unlocked, pets secured, outdoor obstructions cleared).
For full details on the rollout and safety guidelines, please visit
